Hi, In my project I have to introduce Scissors crossover between two stabling tracks with 5.5m track center. Can anyone explain me how to create scissors crossover with 1:4.444 Diamond crossing and 190R-1:9 Turnouts in Power Rail Track SS2 (PRT)? I have attached the specifications of turn out and Diamond crossing created in PRT. Many thanks, Surya
↧