Forum Post: Bentley Rail Track Point control

$
0
0
Hi, I'm currently modelling some earthworks for proposed railways. I'm having some slight difficulty when it comes to using the Point Control tool. When producing the corridors, i specified the drop interval as 1m. Once this corridor has been produced, the intervals are perfect. However when point controlling, it seems to drop more templates into the corridor e.g. 5 templates per meter. It may be a simple reason as to why it is doing this, but i do not have good enough knowledge on this software. Please could someone explain why this is happening. Kind regards, Hashim Syed