I am getting different values (which i cannot explain) between those generated using a Station Base Report and Slew Diagram Report. All measurements (using microstation tools) suggest that the Station Base Report is correct, but the Slew Diagram Report is based on the "true" regression points of the survey. What is causing the difference and which method is correct?
↧