Hello MX Team (I have been also using MX for many years), Inroads, so Rail Track, has a totally different way of managing alignment than MX. Then we can feel sometime a bit lost even disappointed. But on the other hand we have more freedom than MX gives. If there is a transition already attached to the arc then you can add a float line by a point asking to connect the ARC not the transition. Then you are able to move the point and see the dynamic link including the transition. Rail Track allows to create arcs with transitions even there is no element after the transition. MX does not allow this. So in Rail Track the best is to create the transition first. When you place the arc you may know you will continue the alignment and that a transition is required. But there is a way to add the transition if it is not already there. Sorry, It is not smart but it gives the result. The workflow is using the Add Fixed element" command: set only point 1 (radius, pick a point close but it is not required to be on the alignment) and the length: it creates a transition in space. then connect the transition to the arc then use the floating line command (Please visit the site to view this video)
↧